Translation. Authoritative: ../../design/open-questions-v1.md.
Status: 0 open · 27 closed on 2026-08-17 · the 14 loyalty specs and their PRD sit at
0.2.0 / review, awaiting only sign-off to reach approved and 1.0.0.
- OQ-LOY-02 — expiration becomes a policy of the point currency, not of its kind. Status
points may expire or not, as each company configures. A consequence closed in the same move: when a
status currency expires, the grace period and the
tier.grace_startedevent stop being optional, because otherwise a member loses a tier without ever having stopped buying. - OQ-LOY-07 — multi-program is a first-class capability in F1. It reverses DEC-H2, so ADR-021 was written first and the specs were updated from it. Program count is an entitlement, not a metered metric.
standards/api.md: every policy
parameter is tenant-configurable with a published default.